This series of photos shows progress on the grounds and a visit to the inside of the barracks, including several shots of the upstairs, which had not been available to the public for many years. All photos courtesy of Korwyn Peck (shown at left, doing more photography for us).  unless otherwise noted. Click on any bordered picture for a larger version.

The page on the hospital also includes photos of the new location for the granite monument, which is visible in the lower right corner of the center photo in the first row of July 19. It is being moved from its current spot on the foundation of the Chinese dining room because it is not part of the historical period of preservation. It's new site is quite impressive, however.

July 19 (photos by L. Eichinger)

Barracks roof being replaced New stairway and retaining wall

Piping and trench from restored reservoir for irrigation.

Interior of men's dorm showing ceiling electrical work and boards in storage. Floor is also covered/protected. Poem room with a glimpse of overhead lighting work
Detail of electrical work and overhead lighting changes in the poem room Large upstairs Chinese dorm, previously unavailable for tours. Work in upstairs men's dorm to test character restoration process.
Small upstairs sitting room with protective barriers. Punjabi characters in upstairs sitting room. Small upstairs non-Chinese dorm with protective flooring and wall barriers.

Regrading the lawn to follow the administration building foundation. Septic tank installed. Intended to be closer to water and to the right. Sorting through the Miwok midden excavation, where the septic tanks were intended to go.
All the midden soil is screened with water, held back here. Archeologist, holding a deer jaw, shows the treasures found. A Miwok tool for cleaning deer hides.

July 3

 
Removing the barracks roof Installing a new walkway behind the barracks  
Framework of new retaining wall and stairway below the hospital Septic tank before installation with the foreman who installed it. Septic tank near the waterfront with heating plant in the background.
Site Map
Home
Fast Facts
AI Map
AIA
AngelCam
AL Countdown Pix
Ayala Cove
Calendar
Camp Reynolds
Campsites
Civil War Days
Contact Us
CR Officers
Early History
Events
Fort McDowell
Gift Shop
Gift Shop Orders
Historic Sites
Immigration Station
IS Hospital
IS Interiors
IS Photos
IS Restoration Intro
IS Work - 2005
IS Work 2006 Pt.1
IS Work 2006 Pt.2
IS Work 2006 Pt.3
IS Work 2006 Pt.4
IS Work 2007 Pt.1
IS Work 2007 Pt.2
Kai's Journey
LHP Application
Links
Living History Program
McDowell Slideshow
Membership
Membership Order
Miwok History
Miwoks to Missiles
Mooring Info
Mount LIvermore
Natural History
Nike Installation
Past Connections
Photo Gallery
Photography
Potomac Tour
Quarantine Photos
Quarantine Station
Scholarship App.
School Tours
Travel Scholarship
Victorian Xmas
Visitor Info
Volunteer Roles
Volunteering
WWI Photos

Back Home Up Next

Contents of this page are Copyright © 1998-2003 Angel Island Association, All Rights Reserved.
Please direct questions or comments about the web site to:  WEBM at angelisland.org. Contact the Angel Island Association at 415-435-3972.